The Dakar 2027 route runs from Loulé-Faro in Portugal’s Algarve to Marrakech in Morocco between 9 and 23 January 2027: a prologue plus 12 stages, 7,824 km in total, of which 4,341 km are timed special stages, with six bivouacs and the rest day in Agadir. Two days are raced in Portugal, then an overnight ferry carries the rally to Nador and eleven stages unfold in Morocco. It is the 49th Dakar, the first back on African soil in two decades, and it replaces the Saudi Arabian route that had been announced for 1–15 January. The dates are still subject to FIA World Motor Sport Council approval, and the Kingdom is due to host the 50th edition in 2028.
This is a numbers guide. For the full timeline of how the event left Saudi Arabia, the decisions, the people and the quotes, read our full story of Dakar 2027’s move to Portugal and Morocco. Here we break the route down stage by stage, compare it with the cancelled Saudi plan and put it in the context of Dakar’s 48-year journey across three continents.
In this guide
- Why is Dakar 2027 not in Saudi Arabia?
- Dakar 2027 dates and key schedule
- Dakar 2027 stages: the full route table
- Portugal vs Morocco: how the route splits
- Dakar 2027 route in 10 numbers
- Africa 2027 vs the cancelled Saudi plan
- Where has the Dakar been held? A history in numbers
- What the route means for Arab crews
- FAQ
Key facts: Dakar 2027 route
- Edition: 49th Dakar Rally, opening round of the 2027 FIA-FIM World Rally-Raid Championship
- Dates: 9–23 January 2027 (pending FIA World Motor Sport Council approval)
- Start: Algarve Stadium, Loulé-Faro, Portugal
- Finish: Marrakech, Morocco
- Format: prologue + 12 stages
- Total distance: 7,824 km
- Special stages: 4,341 km (about 55% of the route)
- Rest day: Agadir, Sunday 17 January
- Bivouacs: six
- Sea crossing: overnight Mediterranean ferry to Nador, Morocco
- Saudi Arabia: due to host the 50th edition in 2028
Why Is Dakar 2027 Not in Saudi Arabia?
Saudi Arabia had hosted every Dakar since 2020, seven editions in a row, and the 2027 route had already been unveiled as a loop from King Abdullah Economic City on the Red Sea. In late October 2026 the organiser, A.S.O., and the FIA confirmed that the 49th edition would not run in the Kingdom as planned, citing recent developments in the region, and moved it to Portugal and Morocco instead. The Dakar Classic and the event’s Future Mission 1000 and Saudi Next Gen side programmes move with it.
The relocation is a one-year detour, not a divorce. Both the FIA and A.S.O. say the rally returns to Saudi Arabia in 2028 for its 50th edition. The redesign was done in a matter of weeks, which makes the scale of the new route more impressive: Dakar director David Castera said the team had designed a true Dakar despite the short timeframe. The wider story, including how the 2026 regional calendar was hit across series, is in our report on how F1’s Gulf finale was protected and in the full Dakar relocation story.
Dakar 2027 Dates and Key Schedule
Competitors start arriving in the Algarve almost a week before the first timed kilometre. Here is the shape of the fortnight.
| Date (2027) | What happens | Where |
|---|---|---|
| Tue 5 January | Service park opens | Loulé-Faro, Portugal |
| Wed 6 – Fri 8 January | Administrative and technical scrutineering | Loulé-Faro |
| Sat 9 January | Prologue (29 km special) | Loulé |
| Sun 10 January | Stage 1, then transfer to the port for the overnight ferry | Loulé → Mediterranean crossing |
| Mon 11 January | Arrival in Nador, transfer to the first Moroccan bivouac | Nador → Bouarfa |
| Tue 12 – Sat 16 January | Stages 2 to 6 | Bouarfa, Zagora, Agadir |
| Sun 17 January | Rest day | Agadir |
| Mon 18 – Fri 22 January | Stages 7 to 11 | Smara, Refuge bivouac, Marrakech |
| Sat 23 January | Stage 12 and finish | Marrakech |
When does Dakar 2027 start?
The competition starts with the prologue on Saturday 9 January 2027 at Loulé, next to the 30,000-seat Algarve Stadium that hosts the opening activities. The prologue sets the starting order for Stage 1 the next day. The rally finishes in Marrakech on Saturday 23 January.
Dakar 2027 Stages: The Full Route Table
The table below lists every day of the rally with its timed special and total distance (special plus liaison). The specials add up to exactly 4,341 km, matching the FIA figure, and the daily totals add up to 7,824 km.
| Day | Stage | Route | Special (km) | Total (km) |
|---|---|---|---|---|
| Sat 9 Jan | Prologue | Loulé – Loulé | 29 | 129 |
| Sun 10 Jan | Stage 1 | Loulé – Loulé | 100 | 300 |
| Mon 11 Jan | Transfer | Ferry to Nador, then to Bouarfa | – | 590 |
| Tue 12 Jan | Stage 2 | Bouarfa – Bouarfa | 390 | 490 |
| Wed 13 Jan | Stage 3 | Bouarfa – Bouarfa | 410 | 490 |
| Thu 14 Jan | Stage 4 | Bouarfa – Zagora | 490 | 750 |
| Fri 15 Jan | Stage 5 | Zagora – Zagora | 365 | 540 |
| Sat 16 Jan | Stage 6 | Zagora – Agadir | 365 | 760 |
| Sun 17 Jan | Rest day | Agadir | – | – |
| Mon 18 Jan | Stage 7 | Agadir – Smara | 500 | 790 |
| Tue 19 Jan | Stage 8 | Smara – Refuge | 355 | 525 |
| Wed 20 Jan | Stage 9 | Refuge – Smara | 390 | 625 |
| Thu 21 Jan | Stage 10 | Smara – Smara | 470 | 560 |
| Fri 22 Jan | Stage 11 | Smara – Marrakech | 455 | 1,035 |
| Sat 23 Jan | Stage 12 | Marrakech – Marrakech | 22 | 240 |
| Total | 4,341 | 7,824 |
Is there a marathon stage on Dakar 2027?
Stages 8 and 9 run from Smara out to a “Refuge” bivouac and back, the format Dakar has used in recent years for its marathon refuge, where crews sleep away from the main bivouac and receive no outside assistance. Together the two days cover 1,150 km, including 745 km of specials, in the far south of the route towards Dakhla. Expect the detailed rules for that section to be confirmed in the final regulations.
Where does the route go in Morocco?
After landing at Nador on the Mediterranean coast, the rally heads to Bouarfa in the east for two loop stages, then drops south along the edge of the Atlas through Zagora before swinging west to Agadir for the rest day. The second week pushes deep south to Smara and towards Dakhla, then climbs back north along the Atlantic side and finishes in Marrakech. Expect a mix of fast stony plateaus, dry riverbeds, dune fields and coastal tracks: very different from the volcanic rock and vast sand seas competitors knew in Saudi Arabia.
Portugal vs Morocco: How the Route Splits
Portugal gets the ceremony, the crowds and the first two timed days. Morocco gets almost everything else.
| Portugal | Morocco | |
|---|---|---|
| Racing days | 2 (prologue + Stage 1) | 11 (Stages 2–12) |
| Special-stage km | 129 km | 4,212 km |
| Share of special km | about 3% | about 97% |
| Bivouacs | Loulé | Bouarfa, Zagora, Agadir, Smara, Refuge, Marrakech |
| Partner federation | ACP / FPAK | FRMSA |
| W2RC pedigree | Rally-Raid Portugal round since 2024 | Rallye du Maroc, an established round |
Neither country is new to rally-raid. Portugal has hosted the Rally-Raid Portugal on the World Rally-Raid Championship calendar for three seasons, and the Rallye du Maroc has long been the traditional autumn dress rehearsal for Dakar. Lisbon also hosted the start of the Dakar in 2006 and 2007, the last two editions that reached Senegal.
Dakar 2027 Route in 10 Numbers
Ten figures that tell you what kind of rally this will be.
1. 7,824 km: the total distance
Stat: 15 days, 6 bivouacs, 2 countries. The full route, liaisons included, is 7,824 km. It is about 566 km shorter than the 8,390 km Saudi loop it replaced.
2. 4,341 km: timed special stages
Stat: about 55% of the route. That is close to recent Dakar editions, and an average of about 359 km per numbered stage once the 29 km prologue is set aside. The FIA says most specials sit between 350 and 500 km.
3. 1,035 km: the longest day (Stage 11)
Stat: 455 km special + 580 km liaison. The penultimate day from Smara to Marrakech is the biggest single day of the rally, and it comes when bodies and machines are at their most tired.
4. 500 km: the longest special (Stage 7)
Stat: Agadir → Smara, the day after the rest day. Crews go straight from a day off into the longest timed section of the event, opening the decisive second week.
5. 745 km: specials across the Refuge pair (Stages 8–9)
Stat: 1,150 km over two days. The out-and-back to the Refuge bivouac is where navigation errors and mechanical sympathy will matter most.
6. 590 km: the transfer day after the ferry
Stat: zero timed km. After an overnight Mediterranean crossing, Monday 11 January is a pure transfer that ends at the first Moroccan bivouac in Bouarfa.
7. 29 km: the prologue
Stat: 129 km total day. Short, but it decides the road order for Stage 1, and in Portugal’s fast, tight terrain small gaps can open quickly.
8. 22 km: the final special (Stage 12)
Stat: 240 km total day. A short sprint around Marrakech closes the rally, which means the result is usually settled the day before, but a mistake here can still cost a podium.
9. 350: competitors registered at the announcement
Stat: across bikes, cars, trucks and side-by-sides. Dakar director David Castera gave that figure when the route was revealed, despite the late change of continent.
10. 20 years: the gap since Dakar last raced in Africa
Stat: last African edition 2007, plus 2008 cancelled. The 2008 rally was called off on the eve of the start over security threats, and the event moved to South America in 2009.
Africa 2027 vs the Cancelled Saudi Plan
In May 2026 the Saudi Motorsport Company and A.S.O. had unveiled a 2027 route billed as the longest of the Saudi era. Here is how the replacement compares.
| Saudi plan (cancelled) | Portugal–Morocco (new) | |
|---|---|---|
| Dates | 1–15 January 2027 | 9–23 January 2027 |
| Start / finish | King Abdullah Economic City loop | Loulé-Faro → Marrakech |
| Total distance | 8,390 km | 7,824 km |
| Special stages | 5,320 km | 4,341 km |
| Rest day | Bisha | Agadir |
| Countries | 1 | 2 (plus a sea crossing) |
| Marathon sections | 2 announced | Refuge pair, Stages 8–9 |
The new route has about 979 km fewer timed kilometres, an 18% cut, which reflects the short time available to scout and approve stages. It also starts eight days later, so the finish moves from mid-January to 23 January.
Where Has the Dakar Been Held? A History in Numbers
The Dakar has now been reinvented by geography three times. Here are its eras.
| Era | Years | Notes |
|---|---|---|
| Africa (Paris–Dakar and variants) | 1979–2007 | First edition left Paris on 26 December 1978; Cyril Neveu won on a Yamaha. Lisbon started the 2006 and 2007 editions. |
| Cancelled | 2008 | Called off on the eve of the start over security threats |
| South America | 2009–2019 | Argentina, Chile, Peru, Bolivia and Paraguay |
| Saudi Arabia | 2020–2026 | Seven consecutive editions |
| Portugal + Morocco | 2027 | 49th edition, one-year relocation |
| Saudi Arabia | 2028 | Planned 50th edition |
The last edition held in Saudi Arabia, in January 2026, ended with Nasser Al-Attiyah winning his sixth Dakar in the car category, in a Dacia, while Argentina’s Luciano Benavides won the motorcycle race by just two seconds. Those reigning champions now defend their titles on terrain many of the younger competitors have never raced in a Dakar.
What the Route Means for Arab Crews
For Gulf competitors, the move takes away seven years of home advantage. Saudi stars such as 2025 Dakar winner Yazeed Al-Rajhi and the crews from the Saudi Next Gen programme knew the Kingdom’s dunes and wadis intimately, and many prepared on the same ground through the Saudi Toyota Championship. Morocco is familiar territory for some, especially those who have raced the Rallye du Maroc, but its rocky plateaus and the Atlantic-side sand reward a different kind of navigation.
Al-Attiyah, the most successful Arab driver in the event’s history, goes into 2027 as the reigning car champion and in strong form on regional bajas, as our reports from the Qatar International Baja and the Jeddah Baja show. The Oman International Baja in December is one of the last competitive outings for regional crews before the Algarve start; see our Oman Baja coverage.

Dakar 2027 Route FAQ
It starts at the Algarve Stadium in Loulé-Faro, Portugal, with the prologue on 9 January 2027, and finishes in Marrakech, Morocco, on 23 January 2027.
The route totals 7,824 km, including 4,341 km of timed special stages, spread over a prologue and 12 stages.
The FIA and organiser A.S.O. moved the 49th edition to Portugal and Morocco following recent developments in the region. Saudi Arabia is due to host the 50th edition in 2028.
The rest day is in Agadir, Morocco, on Sunday 17 January 2027, after Stage 6.
There is a prologue and 12 stages. The prologue and Stage 1 are in Portugal; Stages 2 to 12 are in Morocco.
No. The 2027 route does not visit Paris or Senegal. It is the first Dakar raced in Africa since 2007, but it finishes in Marrakech, not in the city of Dakar.
Yes. The FIA and A.S.O. have said the rally will return to Saudi Arabia in 2028 for its 50th edition.
Sources
- FIA — Dakar to return to Africa in 2027 as Portugal and Morocco set to host 49th edition
- RACER — Dakar Rally set for Portugal-to-Morocco route in 2027
- road2rally — Dakar 2027 moves to Portugal and Morocco: the route at a glance
- MCNews — Dakar confirms its 2027 route
- Cycle News — Dakar Rally confirms 2027 route
- Al Riyadh Daily, L’argus and X-raid — the original Saudi 2027 route
- DirtFish, Autosport and The Peninsula — Dakar 2026 results
Featured photo: Carlos Sainz and Michel Périn, Volkswagen Race Touareg, in the dunes during the 2007 Lisbon–Dakar Rally, the last Dakar raced in Africa — Edio / Wikimedia Commons, CC BY-SA 3.0.
More from BISER3A: Dakar 2027: the full relocation story · Al-Attiyah’s record ninth Oman Rally win · F1 2026 rules: the complete guide












